Base Preparation and Levelling
We clean, repair and level the base so the new floor lies flat and lasts.

Floors laid and the finishing touches completed so the job looks done
In Brief
Flooring and finishing is the last stage of a renovation: new floors laid on a prepared base, then skirting, thresholds, edge trims and painting touch-ups completed so the space looks finished. Getting the sequence right matters, because floors are easy to damage if other trades work over them afterwards.
The floor is one of the biggest visual changes in a renovation, and one of the easiest to spoil. A floor laid before the walls are painted gets splashed, and one laid on an uneven base shows every dip. The finishing details, such as skirting boards, thresholds between rooms and trims at edges, make a floor look intentional and finished instead of half done.
We prepare and level the base, lay the floor you have chosen, whether tile, laminate or another type, then fit the skirting, thresholds and trims and make good any paint touch-ups. In larger projects, we lay flooring after the walls, ceilings and most of the painting, so nothing damages it, and protect it until handover. Floor tile installation describes tile floors. This is part of our renovation and fit-out service, with final painting by our painting team.

We clean, repair and level the base so the new floor lies flat and lasts.
The floor you have chosen is laid with the right adhesive or underlay, with expansion gaps and layout planned.
We cut and fit skirting boards and edge trims neatly at corners and doorways.
We fit thresholds between rooms and between different floor types, so the changes are tidy and safe.
We complete the paint and plaster touch-ups around the new floor, so edges and corners look finished.
We protect the new floor during the remaining work and check it at the final walkthrough.
Share the rooms, the flooring type and any samples or photos, and tell us how you use the rooms.
We check the existing floor and levels, plan the layout and confirm the price before starting.
We lay the floor and fit the skirting, trims and thresholds at the right point in the programme.
We complete the final touch-ups, and a walkthrough confirms every item is done.
Every property is different, so we confirm the price before any work starts. These are the things that most often change the time and cost.
Usually after most painting, so the floor is not splashed, with final touch-ups done last. We sequence this as part of the renovation plan.
Sometimes, if the old floor is flat and sound, but it raises the level and can cause problems at doors. We check and advise.
Yes. They are part of finishing and we fit them as part of the flooring job.
It depends on the room, how it is used and your budget. We advise on options, and for tile floors see floor tile installation.
It depends on the flooring type and any adhesive used. We tell you when it can be walked on and when furniture can go back.
Get a free quote today and let our expert technicians bring reliable flooring and finishing to your Dubai property.
Get a Free QuoteTell us what you need and we'll get back to you with a clear quotation — no obligation.